04 Wright Road, Wychwood, Germiston, 1401 011 615 2967

Reference Projects

Client:

Babcock Engineering

Project:

Kendal Power Station

Nature of Work:

Shutdown maintenance and Refurbishment of boilers including fabrication and different types of specialised welding. (Small and Large bore high pressure piping)


Duration:

3 to 8 weeks
2012
2013
2014,2015 & 2016

.


Matla Power Station

Shutdown maintenance and Refurbishment of boilers including fabrication and different types of specialised welding. (Small and Large bore high pressure piping)


3 to 10 weeks
Besides our permanent maintenance Crew
2012,2013
2014,2015 & 2016

.


Grootvlei Power Station and
Majuba Power Station

Shutdown maintenance and Refurbishment of boilers including fabrication and different types of specialised welding. (Small and Large bore high pressure piping)



3 to 8 weeks
Besides Permanent maintenance Crew
2012
2013 & 2014

.


Hendrina Power Station

Shutdown maintenance and Refurbishment of boilers including fabrication and different types of specialised welding. (Small and Large bore high pressure piping)



3 to 8 weeks
2012
2013
2014, 2015 & 2016

.

Jetpark Workshop

Shutdowns and Repairs of Boilers including fabrication and different type X-Ray welding.

3 to 5 months
2012
2013,2014,
2015,2016 & 2017

Steinmuller
Africa

Kriel Economiser

Boiler Economiser
replacement project

3 to 8 weeks
2012
2013
2014

.


Komati Power Statio
Hendrina Power
Station
Matla Power Station Kriel Power Station Duvha Power Station
Majuba Power Station
Camden Power Station


Shutdown maintenance and Refurbishment of boilers including fabrication and different types of specialised welding. (Small and Large bore high pressure piping)



3 to 12 Weeks
2012
2013
2014

Spiecpag JV
Group Five

NMPP Pipeline
Heildelburg to Durban

Installation of and Welding of 24 inch Diameter, 554km long pipeline


August 2009 to 2012

W.B.HO JV
Spiecapag

GNP Sasol Pipeline(Balfour to Secunda)


Pipeline Project

October 2011 to to
December 2012

Steinmuller Africa

SASOL FT-WEP
Expansion Paint

Erection of new structures, Piperacks and Pipelines on site


August 2012 to
February 2014

B.C.S

S.O.M Standerton

Fabrication Works

June 2013 to
January 2014


B.C.S

NedanMokopane

Structures and Fabrication

June 2013 to
April 2014


B.C.S

Krugersdorp Workshop


Piping and Welding

February 2014 to
2015

Bliss Chemicals

Wadeville, Germiston

Fabrication and Structures

July 2013 to
February 2014


Group Five &
WK Construction

Mozambique Project
Rompco Loop Line


Rompco Loop Line

December 2013 to
March 2015

FlourSA (PTY) LTD

GHHER Project

Shut Down maintenance and Refurbishment of Boilers, including fabrication and different types of specialised welding. (Small and Large Bore High Pressure Piping)


From June 2014 to December 2014


Kentz Engineers & Contsructors


TSS Project HR/IR

Shutdown maintenance and Refurbishment of boilers including fabrication and different types of specialised welding. (Small and Large bore high pressure piping)




November 2014 to
January 2015

Group Five

Kgalagadi Pipeline in Kathu,
Northern Cape


Pipe jacking

2016 to 2018

.


Phalabora Mining Company (PMC)-
Power Station

Shutdown maintenance and Refurbishment of boilers including fabrication and different types of specialised welding. (Small and Large bore high pressure piping)




3 to 12 Weeks
2017
2019


Actom John
Thompson


Sappi Ngodwana Mpumalanga

Shutdown maintenance and Refurbishment of boilers including fabrication and different types of specialised welding. (Small and Large bore high pressure piping)




3 to 12 weeks
2019

.

Tutuka Power Station
Camden Power Station
Grootvlei Power Station
Komati Power Station
Matimba Power Station
Kendal Power Station
Matla Power Station


Shutdown maintenance and Refurbishment of boilers including fabrication and different types of specialised welding. (Small and Large bore high pressure piping)


3 to 12 Weeks
2017
2018
2019
2020
2021